<?xml version="1.0" encoding="utf-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0" xml:base="https://insideucr.ucr.edu/">
  <channel>
    <title>Inside UCR</title>
    <link>https://insideucr.ucr.edu/</link>
    <description/>
    <language>en</language>
    
    <item>
  <title>North campus sidewalk reopens</title>
  <link>https://insideucr.ucr.edu/stories/2026/02/12/north-campus-sidewalk-reopens</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2026-02/dsc_0406_0.jpg?h=5759fce1&amp;amp;itok=vWXP1LFi" alt="UTLF construction"&gt;

  


A widely used campus walkway has reopened to pedestrians as UC Riverside’s new instructional building project draws closer to completion.
The sidewalk at the north side of campus, running along the Amy Harrison Athletic Field and UCR Soccer Stadium, had been closed since mid-December as part of construction for the Undergraduate Teaching and Learning Facility, or UTLF.</description>
  <pubDate>Thu, 12 Feb 2026 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">c561d41a-4150-4e63-b078-d2a8ce2905c2</guid>
    </item>
<item>
  <title>North District 2 housing honored with innovation award</title>
  <link>https://insideucr.ucr.edu/awards/2026/02/04/north-district-2-housing-honored-innovation-award</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2026-02/2025-08-19_nd2_001_0.jpg?h=10d202d3&amp;amp;itok=TdYRL8Zx" alt="North District 2 "&gt;

  


UC Riverside’s first-of-its-kind North District Phase 2 student housing complex received the Mayor’s Innovation Award at the Riverside State of the City on Jan. 28.</description>
  <pubDate>Wed, 04 Feb 2026 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">b73b3640-30b9-43e0-94db-1b9ba2efeb7e</guid>
    </item>
<item>
  <title>Research and innovation park project progresses</title>
  <link>https://insideucr.ucr.edu/stories/2026/01/12/research-and-innovation-park-project-progresses</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2026-01/2025-12-18_oasis_construction_004.jpg?h=b652b381&amp;amp;itok=ItbsxerE" alt="OASIS construction"&gt;

  


Six months after breaking ground, UC Riverside’s SoCal OASIS Park™ has one its most notable design elements in place.
Construction crews completed installation in December of the wood frame and paneling in the front portion of the building.&amp;amp;nbsp;</description>
  <pubDate>Mon, 12 Jan 2026 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">f661a4a0-8655-4711-8477-87fae3594e11</guid>
    </item>
<item>
  <title>New business building wins architecture award</title>
  <link>https://insideucr.ucr.edu/awards/2025/11/04/new-business-building-wins-architecture-award</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-11/2024-09-30_school_of_business_138.jpg?itok=JYyJCwIo" alt="School of Business building"&gt;

  


Award recognizes design excellence and innovation</description>
  <pubDate>Tue, 04 Nov 2025 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">4275a5e8-978d-45cd-beea-443c32d81a72</guid>
    </item>
<item>
  <title>North District 2 opening celebrated at ribbon-cutting ceremony</title>
  <link>https://insideucr.ucr.edu/stories/2025/10/01/north-district-2-opening-celebrated-ribbon-cutting-ceremony</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-10/2025-09-29_nd2_rribbon_cutting_083.jpg?h=10d202d3&amp;amp;itok=4J0POjaa" alt="Ribbon cutting for North District 2" data-title="North District 2 ribbon-cutting" data-description="Dyeem Tolbert, a second-year Riverside City College student who moved into North District 2, spoke about the opportunities he&amp;amp;#039;s looking forward to at the North District 2 ribbon-cutting ceremony  Monday, September 29, 2025 at UC Riverside. 
(UCR/Stan Lim)"&gt;

  


UC Riverside celebrated the completion of its North District 2 student housing complex Monday, Sept. 29, with more than 200 guests gathered at a courtyard outside one of the apartment buildings.&amp;amp;nbsp;</description>
  <pubDate>Wed, 01 Oct 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">e6122ee3-f910-4de3-a054-2081a450e2a5</guid>
    </item>
<item>
  <title>Oak tree art display honors Native American history</title>
  <link>https://insideucr.ucr.edu/stories/2025/09/16/oak-tree-art-display-honors-native-american-history</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-09/2025-08-01_native_display_001.jpg?h=10d202d3&amp;amp;itok=tie9mRTc" alt="oak tree art display"&gt;

  


A new art display at UC Riverside’s Student Success Center pays tribute to the region’s Indigenous tribes and the trees sacred to them with a wood carving made from oak trees that once stood at the site.
A celebration and unveiling for the oak tree art display, which was installed in July, will be held Sept. 23.
The installation, mounted on a wall on the building’s first floor, combines several wood pieces to create a 20-foot-wide and 10-foot-long display.</description>
  <pubDate>Tue, 16 Sep 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">376cdd1e-7007-468d-856d-1800c36a8315</guid>
    </item>
<item>
  <title>North District 2 welcomes its first group of student residents</title>
  <link>https://insideucr.ucr.edu/stories/2025/08/27/north-district-2-welcomes-its-first-group-student-residents</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-08/dsc_0617.jpg?h=fee4874d&amp;amp;itok=KVGYlZ1k" alt="North District 2 move-in " data-title="North District 2 move-in" data-description="A view of the courtyard of North District 2. (RCCD/Liz Lecona)"&gt;

  


UC Riverside opened its newest student residential community Saturday, Aug. 23, welcoming close to 250 students from Riverside Community College District, or RCCD.</description>
  <pubDate>Wed, 27 Aug 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">fdf2b92a-a39a-4eb9-b15d-60403efe3d81</guid>
    </item>
<item>
  <title>New student housing complex readies for opening</title>
  <link>https://insideucr.ucr.edu/stories/2025/07/22/new-student-housing-complex-readies-opening</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-07/2025-07-09_nd2_015.jpg?h=8b9d9052&amp;amp;itok=fS-gT4k1" alt="North District phase 2 construction" data-title="North District 2" data-description="Crews complete the final touches of construction at North District Phase 2 which features a two-story pedestrian arcade with a roof.  (UCR/Stan Lim)
concrete columns and a roof providing shade."&gt;

  


Construction crews are putting the finishing touches on UC Riverside’s new student housing complex project in advance of its opening next month.
Major construction of North District Phase 2 is mostly complete with work expected to be wrapped up soon, said John Franklin, a project manager with the Office of Planning, Design, and Construction. The first group of students will move in later that month in advance of Riverside Community College District’s fall semester, which begins Aug. 25.</description>
  <pubDate>Tue, 22 Jul 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">a36c14cd-d98a-4b48-bf5d-a3ed428ae5bc</guid>
    </item>
<item>
  <title>Higher ed planners honor SOM II design</title>
  <link>https://insideucr.ucr.edu/awards/2025/07/17/higher-ed-planners-honor-som-ii-design</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-07/2023-09-15-som-ed-ii-building-041-1.jpg?h=adf297ed&amp;amp;itok=wIZIyvvn" alt="School of Medicine Ed Bldg II"&gt;

  


UC Riverside’s new School of Medicine instructional building was recognized for excellence in architecture by the Society for College and University Planning.</description>
  <pubDate>Thu, 17 Jul 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">039dca21-7864-4475-a666-d2ceed9ef3de</guid>
    </item>
<item>
  <title>UCR celebrates groundbreaking for innovation park</title>
  <link>https://insideucr.ucr.edu/stories/2025/06/27/ucr-celebrates-groundbreaking-innovation-park</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-06/2025-06-23_oasis_groundbreaking_047.jpg?h=10d202d3&amp;amp;itok=6PTpdd84" alt="OASIS groundbreaking"&gt;

  


UC Riverside has begun construction of the SoCal OASIS™ Park, a research and innovation hub near campus that represents a major step in promoting economic growth in Inland Southern California.
Community and campus leaders celebrated the project at a groundbreaking ceremony Monday, June 23, at the 3.44-acre site on University Avenue near campus. The $68 million project is expected to be completed by spring 2027.</description>
  <pubDate>Fri, 27 Jun 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">61445d9e-7403-4fc8-a3f2-7e8b8d7b2980</guid>
    </item>
<item>
  <title>Former UCR Extension building demolished</title>
  <link>https://insideucr.ucr.edu/stories/2025/06/04/former-ucr-extension-building-demolished</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-06/2025-05-29_extensions_011.jpg?h=cda740c8&amp;amp;itok=lGO3MlhW" alt="UC Extension building demolished" data-title="End of an era" data-description="Crews work to demolish the old UC Riverside Extension building on May 29, 2025.  The 3.44-acre site will be developed into the SoCal OASIS&amp;amp;trade; Park which will start construction this summer. (UCR/Stan Lim)"&gt;

  


The final pieces of the old UC Riverside Extension building came down last week as construction crews completed its demolition.
The 3.44-acre site will be developed into the SoCal OASIS™ Park, construction of which will start this summer. The park will serve as a hub for research and economic development with laboratories, startup space, and training facilities.</description>
  <pubDate>Wed, 04 Jun 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">011d1fb8-e7fb-4451-a7e8-f96632048206</guid>
    </item>
<item>
  <title>New instructional building passes construction milestone</title>
  <link>https://insideucr.ucr.edu/stories/2025/04/24/new-instructional-building-passes-construction-milestone</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-04/dsc_0525.jpg?h=fee4874d&amp;amp;itok=3DgoqvsC" alt="UTLF construction" data-title="New instructional building" data-description="A topping out celebration for the Undergraduate Teaching and Learning Facility project was held on April 8, 2025. (UCR/Imran Ghori)"&gt;

  


Progress on UC Riverside’s new instructional building project reached a major milestone this month with the full frame now standing.
The construction team poured the final concrete placement at the top of the four-story Undergraduate Teaching and Learning Facility on April 17, representing the completion of the first major phase of work.
“All the major structural elements up to the roof are done,” said Sarah Sabera-Turab, a senior project manager with Planning, Design, and Construction.</description>
  <pubDate>Thu, 24 Apr 2025 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">4dee38f1-0a12-49d7-b544-3641e55301e7</guid>
    </item>
<item>
  <title>School of Business wins Riverside beautification award</title>
  <link>https://insideucr.ucr.edu/awards/2025/02/04/school-business-wins-riverside-beautification-award</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2025-02/2024-09-30_school_of_business_138.jpg?h=6f0db678&amp;amp;itok=kTRY6fnI" alt="School of Business building"&gt;

  


UC Riverside was honored at the city of Riverside’s annual beautification awards for its new School of Business building.
The new four-story building, which opened last fall, received the Sustainable Design &amp;amp;amp; Innovation Award as part of the Keep Riverside Clean and Beautiful Awards on Thursday, Jan. 30.</description>
  <pubDate>Tue, 04 Feb 2025 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">bab04666-5066-446d-aa16-8b30f7482630</guid>
    </item>
<item>
  <title>Old extension building demolition begins</title>
  <link>https://insideucr.ucr.edu/stories/2024/12/17/old-extension-building-demolition-begins</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-12/2024-12-06_unex_demolition_012.jpg?h=10d202d3&amp;amp;itok=KL8Ro9kX" alt="University extension building demolition"&gt;

  


The old UC Riverside Extension building is coming down to make way for a new clean technology park.
Demolition began in November of the former UCR Extension Center on University Avenue, with the parking garage torn down over the course of a month.
Following some cleanup work at the 3.44-acre site, demolition of the building will begin early next year and is expected to be completed by summer, said Daneca Stevens, a project manager with Planning, Design, and Construction.</description>
  <pubDate>Tue, 17 Dec 2024 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">c9d2c398-9cbf-4c65-afe7-e74d563a8568</guid>
    </item>
<item>
  <title>North District housing project completes major structural work</title>
  <link>https://insideucr.ucr.edu/stories/2024/11/12/north-district-housing-project-completes-major-structural-work</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-11/2.jpg?h=c971ec44&amp;amp;itok=DU026HBP" alt="North District phase 2 construction" data-title="North District phase 2" data-description="Work has begun on intramural playing fields as part of the North District Phase 2 student housing complex. (UCR/Imran Ghori"&gt;

  


UC Riverside’s new student housing complex project has reached a major milestone and moved on to the next phase of construction.
A topping out ceremony for the North District Phase 2 project was held on Oct. 4 to mark the installation of the last of the prefabricated wall panels for the two apartment-style buildings, which reach up to seven stories in height.</description>
  <pubDate>Tue, 12 Nov 2024 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">985f0917-0721-4bde-90fc-ddbd88a6879f</guid>
    </item>
<item>
  <title>School of Business celebrates new building</title>
  <link>https://insideucr.ucr.edu/stories/2024/10/22/school-business-celebrates-new-building</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-10/2024-10-18_business_ribbon_cutting_016.jpg?h=10d202d3&amp;amp;itok=a9wYCV52" alt="School of Business ribbon-cutting" data-title="A new home for the School of Business" data-description="School of Business  building ribbon cutting ceremony on October 18, 2024 at UC Riverside.
(Carrie Rosema)"&gt;

  


UC Riverside celebrated the start of a new chapter for the School of Business with the dedication of its new four-story instructional and administrative building at a ribbon-cutting ceremony Friday, Oct. 18.</description>
  <pubDate>Tue, 22 Oct 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">2452d2e8-f7a5-41f4-8eba-7f9385661812</guid>
    </item>
<item>
  <title>UCR starts construction on new instructional building</title>
  <link>https://insideucr.ucr.edu/stories/2024/10/09/ucr-starts-construction-new-instructional-building</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-10/2024-10-04_utlf_ground_breaking_001.jpg?h=10d202d3&amp;amp;itok=tAwPzNgp" alt="bulldozer at groundbreaking" data-title="UTLF" data-description="State Sen. Richard Roth and Chancellor Kim A. Wilcox in front of a model of the project at the Undergraduate Teaching and Learning Facility ground breaking ceremony on Friday, October 4, 2024, at UC Riverside. (Stan Lim/UCR)"&gt;

  


UC Riverside celebrated its growth and future with campus and community leaders at a groundbreaking ceremony for a major student instructional building on Friday, Oct. 4.
About 75 people attended the event at former Parking Lot 19, where the four-story, 100,700-square-foot Undergraduate Teaching and Learning Facility is being built.&amp;amp;nbsp;</description>
  <pubDate>Wed, 09 Oct 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">634a3f33-09d1-4be3-942e-c748c117158a</guid>
    </item>
<item>
  <title>Arts Building improvements underway</title>
  <link>https://insideucr.ucr.edu/stories/2024/09/03/arts-building-improvements-underway</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-09/dsc_0032.jpg?h=fee4874d&amp;amp;itok=53Z52wu5" alt="Crew works on Arts Building renovations"&gt;

  


A summer renovation project of UC Riverside’s Arts Building will help fix drainage problems at the site.
Since June, the building has been surrounded by fencing as construction crews began work.</description>
  <pubDate>Tue, 03 Sep 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">09bb3986-18c6-4e55-b212-16ace99ffd51</guid>
    </item>
<item>
  <title>New School of Medicine building wins design/construction awards</title>
  <link>https://insideucr.ucr.edu/awards/2024/08/20/new-school-medicine-building-wins-designconstruction-awards</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-08/2023-09-15-som-ed-ii-building-039-2.jpg?h=f84b0e9f&amp;amp;itok=nc5mjeHD" alt="School of Medicine Ed Bldg II"&gt;

  


UC Riverside’s new School of Medicine instructional building won two awards from a construction industry trade publication.
The School of Medicine Education Building II, which opened in September 2023 after two years of construction, received the Award of Merit in the Excellence in Sustainability category and an Award of Merit in Higher Education/Research from Engineering News-Record California.</description>
  <pubDate>Tue, 20 Aug 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">0d86911d-42dc-44d1-b272-0d5f568a70d4</guid>
    </item>
<item>
  <title>Prep work begins for new classroom and instructional lab building</title>
  <link>https://insideucr.ucr.edu/stories/2024/07/29/prep-work-begins-new-classroom-and-instructional-lab-building</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-07/dsc_0134-copy.jpg?h=71ddc9d5&amp;amp;itok=qc8bxAiB" alt="construction work at lot 19"&gt;

  


Preliminary work has begun on UC Riverside’s new instructional building complex.
The area around Parking Lot 19, south of the UCR Soccer Stadium, was fenced off in June as crews begin demolishing the asphalt surface to prepare the site for construction of the Undergraduate Teaching and Learning Facility.</description>
  <pubDate>Mon, 29 Jul 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">2d9efce6-2ef1-4ee4-b105-b4cf40cc6b64</guid>
    </item>
<item>
  <title>Physics Building roof replacement begins</title>
  <link>https://insideucr.ucr.edu/stories/2024/07/24/physics-building-roof-replacement-begins</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-07/dsc_0226.jpg?h=fee4874d&amp;amp;itok=tybOSxqI" alt="Crews working on Physics building roof"&gt;

  


UC Riverside’s Physics Building will get a new roof as part of a renovation of the aging building.
Construction work began June 17 with the work expected to be completed by September in time for the fall quarter.
The project involves completely demolishing the roof and replacing it with a new roofing system, said Fernando Nunez, a project manager with the Office of Planning, Design, and Construction.</description>
  <pubDate>Wed, 24 Jul 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">84759571-fa67-4d5d-9714-a35f3d60eb65</guid>
    </item>
<item>
  <title>North District housing complex walls go up</title>
  <link>https://insideucr.ucr.edu/stories/2024/06/17/north-district-housing-complex-walls-go</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-06/2024-06-06_north_district_ii_008.jpg?h=f677ae0d&amp;amp;itok=JmUQG2PN" alt="North District phase 2 construction" data-title="North District phase 2" data-description="UCR and RCCD campus leaders tour North District Phase 2 with the construction management team on May 30, 2024. (UCR/Imran Ghori)"&gt;

  


Three large cranes, more than 10 stories high, tower over UC Riverside’s North District Phase 2 project, lifting wall panels and setting them into place.
Construction crews at the project site have been repeating those steps over the last few weeks as the student housing project moves forward with the next phase of construction.</description>
  <pubDate>Mon, 17 Jun 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">f6d8d2e6-2228-43e5-856a-e811be8f5b9e</guid>
    </item>
<item>
  <title>Batchelor Hall renovation nearing completion</title>
  <link>https://insideucr.ucr.edu/stories/2024/05/16/batchelor-hall-renovation-nearing-completion</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-05/dsc_0012.jpg?itok=x06Wx8uj" alt="Batchelor Hall"&gt;

  


A major renovation of UC Riverside’s Batchelor Hall is nearing completion after almost two years of construction.
The work, which includes significant upgrades to the building’s mechanical, electrical, and plumbing systems, will be finished by the end of June. Work began in fall 2022.</description>
  <pubDate>Thu, 16 May 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">8322543d-a182-4900-af74-881a5e770f85</guid>
    </item>
<item>
  <title>Campus celebrates Native American Garden</title>
  <link>https://insideucr.ucr.edu/stories/2024/04/16/campus-celebrates-native-american-garden</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-04/dsc_1098.jpg?h=fee4874d&amp;amp;itok=WQH6YaUw" alt="Native American Garden"&gt;

  


UC Riverside’s Native American community celebrated the new Native American Garden on campus with music and dance in the first large gathering in the space since the project opened.
The grand opening celebration on Tuesday, April 9, featured the Mountain Cahuilla Bird Singers, who danced and sang in the sand circle at the center of the garden to a large crowd gathered around them. The event was sponsored by Native American Student Programs.</description>
  <pubDate>Tue, 16 Apr 2024 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">05886ace-56c1-44c2-adc1-fe0b0f49daa7</guid>
    </item>
<item>
  <title>Spieth Hall gets a new roof</title>
  <link>https://insideucr.ucr.edu/stories/2024/02/08/spieth-hall-gets-new-roof</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-02/dsc_0707.jpg?h=42bf3122&amp;amp;itok=GKxVUTai" alt="Spieth Hall roof"&gt;

  


UC Riverside’s Spieth Hall has a new roof and an improved fume hood exhaust system as part of a recently completed renovation project.
Replacing the aged roof on the building, which was built in 1957, was a major portion of the work, which began in summer 2022 and was completed this month.
The old roof had leaks and areas where puddles would accumulate, said Fernando Nunez, a project manager with the Office of Planning, Design, and Construction.
“That roof was in bad shape and needed to be addressed,” he said.</description>
  <pubDate>Thu, 08 Feb 2024 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">ffb41d68-b278-4307-a536-20e916561db9</guid>
    </item>
<item>
  <title>Two new campus buildings honored at Riverside beautification awards</title>
  <link>https://insideucr.ucr.edu/awards/2024/01/29/two-new-campus-buildings-honored-riverside-beautification-awards</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-01/2023-09-15-som-ed-ii-building-041.jpg?h=52335b38&amp;amp;itok=s9NePSpk" alt="School of Medicine Ed Bldg II"&gt;

  


UC Riverside’s new School of Medicine building and Student Health and Counseling Center won top awards in the city of Riverside’s annual beautification awards.
The two buildings, which both opened last fall, were honored at Riverside Mayor Patricia Lock Dawson’s State of the City address Thursday, Jan. 25, as part of the Keep Riverside Clean and Beautiful Awards.</description>
  <pubDate>Mon, 29 Jan 2024 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">0b5c2618-86fa-4f88-99cb-81987ab875ca</guid>
    </item>
<item>
  <title>School of Business building enters next phase of construction</title>
  <link>https://insideucr.ucr.edu/stories/2024/01/02/school-business-building-enters-next-phase-construction</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2024-01/DSC_0688.JPG?h=fee4874d&amp;amp;itok=4GqkTqVn" alt="School of Business under construction" data-title="School of Business new building" data-description="Construction crews celebrated the the midpoint of construction for the new School of Business building on Dec. 15, 2023. (UCR/Imran Ghori)"&gt;

  


UC Riverside’s new School of Business building entered a new phase of construction recently as work moves forward for an August 2024 opening.
In late December, the school and construction team celebrated the midpoint of construction as crews poured the final concrete placement for the frame of the building.
“The super structure is what we call it — it’s complete,” said Frank Salhab, project manager with contractor McCarthy Building Companies.</description>
  <pubDate>Tue, 02 Jan 2024 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">423f6c5a-f27c-442b-b3ac-aca396b8d4d1</guid>
    </item>
<item>
  <title>New northwest campus pathway opens</title>
  <link>https://insideucr.ucr.edu/stories/2023/12/19/new-northwest-campus-pathway-opens</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2023-12/DSC_0573.JPG?h=11d7bb19&amp;amp;itok=3RjIR-to" alt="South Rec Mall steps"&gt;

  


A walkway providing easier access at the northwest corner of campus, including to a new student housing complex, is now open.
The South Recreation Mall project began construction in spring and was completed this month.</description>
  <pubDate>Tue, 19 Dec 2023 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">74295018-bc71-4a4d-86d2-ee6c27526acc</guid>
    </item>
<item>
  <title>UCR celebrates construction start for North District 2</title>
  <link>https://insideucr.ucr.edu/stories/2023/11/13/ucr-celebrates-construction-start-north-district-2</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2023-11/AG8I6235.jpg?h=957960a9&amp;amp;itok=Btt7hvt5" alt="North District phase 2 groundbreaking"&gt;

  


UC Riverside and its community partners celebrated a unique collaboration Wednesday, Nov. 4 as construction begins on a new housing complex that will be home to future university and community college students.</description>
  <pubDate>Mon, 13 Nov 2023 00:00:00 -0800</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">28af60c0-b3f2-43d2-9963-320f1e93cb59</guid>
    </item>
<item>
  <title>School of Medicine holds ribbon-cutting for new building</title>
  <link>https://insideucr.ucr.edu/stories/2023/09/29/school-medicine-holds-ribbon-cutting-new-building</link>
  <description>&lt;img loading="eager" width="1170" height="450" src="https://insideucr.ucr.edu/sites/default/files/styles/news_article_featured_l/public/2023-09/2023-09-26%20SOM%20090.JPG?h=f61c29c3&amp;amp;itok=xUptgHt1" alt="School of Medicine Ed Bldg II"&gt;

  


UC Riverside leaders reflected on the 10-year anniversary of the School of Medicine and looked to the future as they celebrated the opening of a new educational building.
More than 300 guests attended a ribbon-cutting ceremony for the School of Medicine Education Building II on Tuesday, Sept. 26, including local legislative leaders and two members of the UC Board of Regents.</description>
  <pubDate>Fri, 29 Sep 2023 00:00:00 -0700</pubDate>
    <dc:creator>Imran Ghori</dc:creator>
    <guid isPermaLink="false">c10507f3-903d-425d-9574-f95ba414893a</guid>
    </item>

  </channel>
</rss>
